CommercialHarbor Point Mixed-Use District
Two residential blocks over a shared retail podium and structured parking, with an underground stormwater system beneath the plaza.
- Structural Engineering
- Site Development
- Stormwater Management
Licensed professionals · 18 states · Established 2009
info@vertexdesignsolution.coK–8 Educational Facility
A 94,000 square foot K–8 school with separated bus and parent circulation, delivered on a summer-to-summer schedule.

Cedar Grove is a 94,000 square foot K–8 facility for 720 students, including a gymnasium, media center, and dedicated early-grade wing.
Vertex delivered structural, civil, and MEP engineering under a public procurement process with a fixed academic-calendar schedule.
Load-bearing masonry with steel joist roof framing for durability and predictable public-bid pricing.
Fully separated bus loop and parent drop-off circulation with independent site access points.
Displacement ventilation in the large assembly spaces for acoustic and energy performance.
Challenges
Solutions
Project data
Services provided
Gallery



Related work
Start a conversation
Share the project, the site, and the schedule. Our team will tell you what it takes to move it forward — and what it will realistically require.