Stormwater Approvals: What Reviewers Actually Look For
Comment cycles on stormwater submittals are predictable. Most of them trace back to four recurring gaps.
- Category
- Civil Engineering

Stormwater review is where site plans most often stall. In our experience the same four gaps generate the majority of comments.
First, undocumented assumptions. Reviewers cannot verify a curve number or a time of concentration they cannot trace. Show the derivation, not just the result.
Second, mismatched drainage areas. The area used in the model has to match the area shown on the plan sheet, including offsite flow entering the site.
Third, outfall adequacy. A designed release rate means nothing if the receiving system cannot accept it. Downstream analysis belongs in the first submittal, not the third.
Fourth, maintenance access. If a reviewer cannot see how a facility gets maintained in twenty years, they will ask. Draw the access route and include the agreement language up front.
Addressing these before the first submittal has consistently cut our review cycles roughly in half, which on entitlement schedules is measured in months.
Start a conversation
Tell us what you're building.
Share the project, the site, and the schedule. Our team will tell you what it takes to move it forward — and what it will realistically require.
- Projects team
- info@vertexdesignsolution.co
- +1 (229) 791-2354