RFI Response Time Is a Design Deliverable

The quality of a document set is judged in the field, and the clock starts the day construction begins.

Category
Construction
Engineers reviewing construction drawings on site

Every set of construction documents generates questions. What separates a well-served project from a troubled one is how fast those questions get answered.

A four-day RFI turnaround on a critical path item can cost more than the engineering fee for the sheet in question. Crews demobilize, sequences shift, and the schedule absorbs the loss.

We commit to a 48-hour response target on construction-phase RFIs and keep the engineer of record — not a separate service group — assigned through closeout.

That continuity matters. The person who made the design decision can answer in one pass instead of reconstructing intent from drawings.

It also improves the next project. Recurring field questions tell us exactly where our documents are unclear, and those lessons go straight into the standards.